Previous Icon 3

Next Icon 3

Base pressure angle of contact analysis

Normally, the contact analysis is performed for a pitch (or for a system period in the case of planetary systems).

For a cylindrical gear pair, for a pitch, the base position of meshing i, for N positions of meshing, is:

Stirnradpaar_Eingriffsstellung

TE = transmission error

For a planets system, for a pitch, the base position of meshing (sun and planet carrier) i, for N positions of meshing, is:

Planetensystem_Eingriffsstellungen

Here, the following apply:

p = system period

C = planet carrier

S = sun

H = internal gear

TEc = transmission error, planet carrier

sn = tooth thickness, sun

dw = operating pitch diameter

cx,y = position of the first planet in the Cartesian coordinate system