Reliability

Reliability is calculated according to Bertsche's study [105], in which the possible methods have been described in great detail. The most commonly used approach, and one which is well suited to the results that can be achieved in "traditional" mechanical engineering calculations, is the "Weibull distribution". In this case, Bertsche recommends the use of the 3-parameter Weibull distribution. The reliability, R, of a machine element is calculated as a function of the number of load cycles, t, using the following equations.

Reliability

Parameters T and t0 can be derived from the mathematically achievable service life of the component, Hatt, as follows (with FO according to the calculation method, Table 1, β and ftB from Table 2 according to Bertsche).

Calculation method

Damage probability Fo

 

1%

10%

Other

Comment

Shaft, DIN 743

 

 

2.5%

Assumed, not documented

Shaft, FKM guideline

 

 

2.5%

 

Shaft, AGMA 6001

*

 

 

If kC = 0.817

Rolling bearing, ISO 281

 

*

 

If coefficient a1 = 1.0

Tooth flank, ISO 6336; DIN 3990

*

 

 

 

Tooth root, ISO 6336; DIN 3990

*

 

 

 

Tooth flank, AGMA 2001

*

 

 

If randomness factor KR=1

Tooth root, ISO 6336; AGMA 2001

*

 

 

If randomness factor KR=1

Table 1 14.6a: Damage probability for different calculation methods when determining material properties

12-Zuverlaessigkeit_1v

12-Zuverlaessigkeit_2v

with

12-Zuverlaessigkeit_v3

 

Coefficient ftB

Weibull shape parameter β

Shafts

0.7 to 0.9 (0.8)

1.1 to 1.9 (1.5)

Ball bearing

0.1 to 0.3 (0.2)

1.1

Roller bearing

0.1 to 0.3 (0.2)

1.35

Tooth flank

0.4 to 0.8 (0.6)

1.1 to 1.5 (1.3)

Tooth root

0.8 to 0.95 (0.875)

1.2 to 2.2 (1.7)

Table 2 14.6b: Factors for a Weibull distribution according to Bertsche, average values used in KISSsoft given in brackets

Note:

Calculating reliability using Weibull distribution uses the calculated service life, and so also takes into account the required safeties. To calculate reliability without taking required safeties into account, set the safeties to 1.0.